The final payment shall be designed thirty (30) times once the Contractor shall have obtained within the Owner the ultimate payment below their Arrangement, provided the Subcontractor and his surety shall have fulfilled and performed most of the covenants and situations of the Subcontract.heap up, stack up, pile up - arrange into piles or stacks; "